The Spaulding's wanted a bathroom Renovation but they were unsure how to proceed. They had multiple outlandish quotes with none of them actually doing what they asked. We at Vision builders updated their bathroom to satisfaction.
They wanted to keep their counter, mirror and cabinets. We renovated everything else.
New tile on the floor, custom shower tile with a bench, soft close shower doors, new sink, new toilet, fresh trim, fixtures and all new paint.
We took this 1990's bathroom and made it a masterpiece
The Spaulding’s Project



The Roosevelt Project
This small business suffered fire damage and needed an entire rebuild. We were contracted out to do the drywall and insulation.
The owner was quoted an outlandish price and a 9 month time frame by the insurance selected contractor.
We helped do a little bit of framing and some floor work to push the job forward along with all the drywall installation and insulation of the entire building.
The entire project took less than 2 months from start to finish.