The Spaulding's wanted a bathroom Renovation but they were unsure how to proceed. They had multiple outlandish quotes with none of them actually doing what they asked. We at Vision builders updated their bathroom to satisfaction.

They wanted to keep their counter, mirror and cabinets. We renovated everything else.

New tile on the floor, custom shower tile with a bench, soft close shower doors, new sink, new toilet, fresh trim, fixtures and all new paint.

We took this 1990's bathroom and made it a masterpiece

The Nelson’s Project

The Spaulding’s Project

bathroom remodel before
bathroom remodel after
bathroom remodel aftfer
20131 Grove Street

The Roosevelt Project

This small business suffered fire damage and needed an entire rebuild. We were contracted out to do the drywall and insulation. 

The owner was quoted an outlandish price and a 9 month time frame by the insurance selected contractor. 

We helped do a little bit of framing and some floor work to push the job forward along with all the drywall installation and insulation of the entire building.

The entire project took less than 2 months from start to finish.

fire damage before
Bathroom after
IMG_0869.JPG
drywall repair after fire damage
fire damage before
Fire damage before